This project consisted of widening approximately 2 miles of 14th Street in midtown Atlanta, as well as the relocation of Williams Street and the inclusion of a new ramp to 17th Street.

This project also included relocation of several utilities, and future considerations for interstate HOV access and a future 15th Street bridge and roadway. Design of all modified and/or new access to this roadway conformed to GDOT specifications. GDOT staff provided Consultant Performance Evaluations during design of this project.

Transportation Engineering and Planning | Roadway Design | Highway Design | Bridge Design

 

Services

Elements

Concept Design

Preliminary Design

Boundary, Topographic, and Utility Location
Surveys

Geotechnical Engineering Services

Right-of-Way Plans

Public Involvement

Architectural Design

Final Engineering Design

Post-Design Services

  • Consultant Performance Evaluations from GDOT during design of this project.

    One such evaluation stated:

    "[MA] Consistently met the required milestones…"


"When needed, they [MA] have added the necessary personnel to complete the required milestones."