District Two (Tennille) CEI (Augusta Area)
Construction Engineering and Inspection

The MA team provided staff to perform construction engineering and inspection services for the Augusta Area in the Tennille District under a three-year contract that ended on January 31, 2012. The services also included construction materials testing, as requested by GDOT, in conformance with the GDOT Sampling and Testing Manual.

1 liaison project manager
11 senior inspectors
4 inspection II’s
4 inspector I’s

Project staff worked on the contract under the supervision of GDOT project engineers and DBE firm KHAFRA Engineering was a part of the team.

Transportation Engineering and Planning | Construction Engineering and Inspection

 

Services

Elements

Construction Engineering and Inspection

Construction Materials Testing

  • I-20/I-520 Interchange reconstruction and widening project, ramp replacements, and five bridge replacements

    I-20 at SR 388 Interchange reconstruction, bridge replacement, ramp reconstructions, turn lanes, and signal upgrades

  • I-20 Widening and reconstruction

    Sebastian Way / Riverwatch widening and reconstruction, six bridges and approaches, video detection system

    Davis Road Interchange at I-20 widening and reconstruction project, ramp relocations, bridge replacements, and signal upgrades

    US 78/SR 10 Bridge Deck Replacement over the Savannah River

    SR 56 Interchange at I-520 reconstruction, ramp relocations, bridge replacement and signal upgrades

    SR 28 widening, intersection improvements, drainage improvements and signal upgrades